Loading Andytools…

Tools You Trust. Projects You Love.!

Andytools

Back to product

How and where to use guide

Siniat Standard Plasterboard 2400mm x 1200mm x 12.5mm SE (72)

Typical applications

This board is suitable for a range of internal construction tasks. Use it for stud partition walls in homes, offices and commercial spaces where a standard fire and acoustic performance is required. It works well for lining existing masonry walls to create a flat, finished surface ready for decoration. Ceiling applications include suspended ceilings and direct fixing to joists in domestic properties and light commercial buildings.

  • Internal stud partition walls
  • Dry lining over masonry
  • Ceiling linings and suspended systems
  • Refurbishment and new build projects

Installation and fixing

Fix the board to timber studs or joists using galvanised or drywall screws at 300mm centres, or drywall nails if preferred. Position screws or nails at least 10mm from the square edge to avoid damage. Stagger joints between adjacent sheets and ensure studs or joists are at standard 400mm or 600mm centres for proper support. Leave a small gap at floor and ceiling level to allow for building movement. For ceiling work, use appropriate temporary support or a lifting frame to hold the board in place during fixing.

  • Fix with drywall screws or galvanised nails at 300mm centres
  • Keep fixings at least 10mm from edges
  • Stagger joints between sheets
  • Support studs or joists at 400mm or 600mm centres
  • Leave small gaps at floor and ceiling for movement

Finishing the square edge

The square edge profile must be finished before decoration. For a taped and jointed finish, apply joint tape over the seams and cover with joint compound in multiple coats, sanding between coats to achieve a smooth surface. Alternatively, apply a full skim coat of finishing plaster across the entire board surface for a more uniform finish. Both methods require skill and experience to achieve a professional result suitable for painting or wallpapering.

  • Tape and joint seams with compound, or apply full skim coat
  • Sand between coats for smooth finish
  • Allow adequate drying time between coats
  • Finish to a standard suitable for painting or wallpapering

On-site handling and storage

Store boards flat and horizontal on a level, dry surface away from damp and direct weather exposure. Keep them indoors or under cover before installation. Handle carefully to avoid damage to edges and corners, as damaged areas are difficult to repair invisibly. Transport boards flat to prevent bending or warping. On site, keep the board dry and allow it to acclimatise to the building environment before fixing, particularly in newly plastered or damp buildings.

  • Store flat and horizontal in a dry location
  • Protect from weather and moisture
  • Handle carefully to avoid edge damage
  • Allow acclimatisation time in new buildings
  • Keep away from wet trades until board is fixed